site prep

Work on the new workshop is underway. Tuesday I tore down the shed that was in the way of the new workshop. It was a flimsy metal building and basically fell down once I removed 51% of the sheet metal screws holding it together. I put it in a pile and the General Contractor hauled it off.

Site prep started today. A skid steer and about 3 tons of dirt showed up around 8:00 am. Bing Bong started barking immediately. The GC staked out the rough location of the building and then the skid steer pilot removed the old concrete slab. With the old slab removed he moved the dirt from the driveway to the back yard and is leveling the site in advance of the building components arriving next week.

I'm excited to have a workshop again as doing the transmission and clutch replacement on the R80 in the carport was pretty hard on me. Once the workshop is done I'll once again be able to work standing up!

wall unit

I have wanted a Mid-Century Modern wall unit for the past several years but there simply wasn't enough room at The Apex. Because of the move I suddenly had the wall and floor space for a modest wall unit. With the help of a friend I was able to bring one home. With my brother-in-law's help I was able to get it installed. This is either 60's engineering at its best (which would be sad) or its worst (which is probably the reality). Either way, the installation was harder and far less elegant than I had hoped. The installation required more than a dozen toggle bolts, four shelf brackets, a handful/footfull of bruises, and the use of each and every swear word I know. I also ended up having a flat tire running back and forth to the home improvements store. In spite of all the challenges, my highly desired Mid-Century Modern wall unit it is installed.

Scroll to top